Harmet Building

Building Processes


1. The modules are loaded on trucks at the factory and transported to the port
2. Loading the modules on board a ship 3. Unloading the modules from the ship
4. Arrival of the trucks to the site 5. The construction site is prepared for lifting the modules 6. Scaffolding is installed before the modules, but the final works are carried out during the assembly of modules
7. Assembly of modules 8. Roof installation 9. External connections work
10. Installation of walkways and balconies 11. Factory-made readiness 12. Communications connections work
13. Interior finishing  14. Inspection 15. The building is ready